In December 2013, Orion has established Oil and Gas Division which signals a starting point for Orion’s endeavor for marching into the conventional oil and gas market.
In Oct 2013,Orion was for the first time in China applied the customized large size coiled tubing in the oil production horizontal well fracturing operation.
In July 2013, Orion has made R & D on flat-pak and hydraulic-driven screw pump and put them into the production application, thus has break through the technical limitation of deviated well, horizontal well, big dogleg angle well and the terrain and topographical limitation for the CBM development.
In April 2013, Orion has ordered 4 sets of coiled tubing equipment from North America, 6 sets of nitrogen fracturing equipment, and has established the Downhole Division and, and the same time the Hebei Zhengding base was officially launched for the services
In March 2013, Orion has pioneered in Henan Mengjin a technology that applied for soft coal horizontal well surface coal digging, pressure bleeding and emergency elimination which opened up a new way for an effective o resolusion of promenent coal gas problem.