New production commissioning

 

The pumping commissioning operation was a parameter optimized design and technical services done by pumping division combining early phase drilling, fracing engineering and geological conditions after drilling and fracing. It mainly consists of sucker rod pump lifting and non rod pump lifting syste, and design of pumps, selection of pipes and stems, selection of engine devices and design of water, dust and fire prevention.

Formulate pump design program based on type of well.

Optimize string structure based on reservoir production characteristics.

Selection of pump run in hole equipment based on fluid property.

20 wells can be commissioned for production at the same time.

 

Accomplish sand bailing and run in hole with pump operation in 7 days.

Offering pumping equipment good for all kinds of wells.

Offering twenty-four seven commissioning operation.