Nitrogen bubble de-blocking

 

Orion utilizes nitrogen bubble speed flowback technique to bring coal powder and cuttings from openhole completion horizontal well into vertical well, thus to restore original wellbore’s productivity contribution and effectively improved single well production and level of utilization of resources.

> 300 well/time pumping engineering and pumping diagnosis services.

>130 horizontal wells pumping and pumping diagnosis services.

2 professional construction teams.

With nitrogen bubble de-plugging, resolved old well low production, low rate of resources utilization issues, this allows more utilization of coal bed methane resources.

Orion applied this technology to wellbore dredging to reservoir permeability improvement; with an approach of nitrogen injection for thinning out viscosity from near well bore formation, reduce flow resistance, improved coal bed methane well productivity and recovery rate.

Beijing Orion Energy Technology & Development Co., Ltd | TEL:(86)010-52707700 |  Fax:(86)010-52707711 | Postal Code:100195

 

京ICP备05027349 Privacy protection;Beijing Orion Energy Technology Development Co., Ltd; All rights reserved